よくある質問

Carrier tape Design Specifications

:2024-10-12 :5
Understanding the Symbols in Carrier Tape Engineering Drawings: 
(1) W - represents width; 
(2) A0 - represents the length of the trench or pit bottom; 
(3) B0 - represents the width of the trench or hole at the bottom; 
(4) D - represents the diameter of the circular edge hole; 
(5) D1 - represents the inner hole diameter; 
(6) D2: Indicates the diameter of the elliptical edge hole; 
(7) E - represents the distance from the horizontal bisector of the circular edge slot to the upper edge of the circular edge slot (width); 
(8) F - represents the distance from the centerline of the half-cylindrical recess to the horizontal line of the edge of the positive circular hole; 
(9) K0 - represents the depth of the trench or pit (second level depth); 
(10) K1 - represents the depth of the first level of the trench; 
(11) P0 - represents the distance between the perpendicular bisectors of the two adjacent edge holes; 
(12) P - represents the distance between the center lines of each of the two phase slots, which is equally divided by the entire slot width; 
(13) P2 - represents the distance from the centerline of any slot to the vertical bisector of the adjacent slot edge; 
(14) T - represents the thickness of the tape; 
(15) T2: This represents the bottom thickness of the strip after it has been formed.