Understanding the Symbols in Carrier Tape Engineering Drawings:
(1) W - represents width;
(2) A0 - represents the length of the trench or pit bottom;
(3) B0 - represents the width of the trench or hole at the bottom;
(4) D - represents the diameter of the circular edge hole;
(5) D1 - represents the inner hole diameter;
(6) D2: Indicates the diameter of the elliptical edge hole;
(7) E - represents the distance from the horizontal bisector of the circular edge slot to the upper edge of the circular edge slot (width);
(8) F - represents the distance from the centerline of the half-cylindrical recess to the horizontal line of the edge of the positive circular hole;
(9) K0 - represents the depth of the trench or pit (second level depth);
(10) K1 - represents the depth of the first level of the trench;
(11) P0 - represents the distance between the perpendicular bisectors of the two adjacent edge holes;
(12) P - represents the distance between the center lines of each of the two phase slots, which is equally divided by the entire slot width;
(13) P2 - represents the distance from the centerline of any slot to the vertical bisector of the adjacent slot edge;
(14) T - represents the thickness of the tape;
(15) T2: This represents the bottom thickness of the strip after it has been formed.